Project ATM Filter

Special structures

Waste Terminal Moerdijk (ATM) construction for new filter.

The installation of a steel construction in an existing building is always a great challenge.

  • Own site

    If interim storage is required, we use our indoor storage facility or our 12,000 m2 outdoor storage area.

  • Design studio and drawing office

    with modern CAD facilities and knowledge of BIM.

  • Own preserving department

    of 2500 m2.

  • Own assembly teams

    for perfect assembly results.

  • 15,500 m2 manufacturing hall

    equipped with numerically controlled production machinery.